High-Margin Enterprise Advisory.
Zero Emergency On-Call.
Productized database and infrastructure diagnostics for Higher-Ed & Enterprise IT leads managing Oracle, PeopleSoft, Banner, and OLVM KVM environments.
Oracle Database July 2026 Critical Patch Update: TNS Listener RCE & Legacy 11g/12c Exposure Analysis
BLUF: The July 2026 CPU fixes unauthenticated TNS Listener Remote Code Execution (CVSS 9.8) flaws in Oracle 19c/23c (RU 19.24 / 23.5). Unpatched legacy 11g, 12c, and 18c databases face severe exposure and require immediate patch or network isolation.
Quarter-Century of Enterprise DBA Mastery.
Productized Asynchronous Execution.
Backed by over 25 years of hands-on experience managing mission-critical Oracle Databases, PeopleSoft ERPs, Ellucian Banner, and Linux hypervisors, DBPros.Net bridges the gap between high-ticket traditional consulting and slow vendor support.
"We engineered DBPros.Net around zero-friction local log sanitization and asynchronous diagnostic reviews so enterprise IT leads get exact, battle-tested parameter fixes in 3–5 days without expensive on-site retainers."
The Enterprise DBA & Infrastructure Audit Collector
Run locally on Windows or Linux to gather diagnostic metrics while masking IPs, hostnames, passwords, and DB credentials.
Specialized Enterprise Stacks
Deep domain expertise in mission-critical higher-ed and enterprise environments.
Oracle Database 19c / 23c
SGA Memory Starvation, Latch Contention & AWR Diagnostics
PeopleSoft Financials & HCM
Buffer Cache Locks, Batch Job Spikes & SQR Optimization
Ellucian Banner Student
SQL Execution Plan Regressions & Registration Locks
Oracle Linux & OLVM KVM
Hypervisor Migration, Kernel Tuning & Swappiness Fixes
Nginx Web Tier
Reverse Proxy Hardening & Keepalive Connection Pooling
Productized Async Audits
Fixed-scope diagnostic reviews backed by automated log sanitization and expert analysis.
ERP Database & Batch Performance Audit
3–5 Days- ✓ Comprehensive AWR / ADDM log review
- ✓ Buffer cache & wait event lock analysis
- ✓ Batch process SQL execution plan fixes
- ✓ 45-min strategic debrief call
Virtualization & OS Kernel Audit (OLVM / KVM)
3–5 Days- ✓ Hypervisor cluster resource allocation
- ✓ Memory overcommit & HugePages validation
- ✓ IOPS & disk latency bottleneck tracing
- ✓ 45-min strategic debrief call